您要查找的是不是:
- Tashan mine are excavated in a main and a auxilary adit. 同煤集團塔山礦採用主、副平硐開拓方式。
- We immediately got our helmet and headlight and go down the adit. 我們立即領取了頭盔及頭燈,準備下礦洞探險。
- Adit Testdesk ownership for organizations of any functional test. Adit Testdesk 擁有用於組織測試的任何功能。
- This time we will only go down the adit 600 meters from the start point. 這次我們的探險旅程只深入礦洞內,往下走約六百米的地方。
- The measured adit water temperature verifies the predicted results and the system behavior proves desirable. 系統運行后,坑道水溫度變化實測數據基本驗證了預測結果,系統運行效果良好。
- Collapse treatment in section of Hongye-2 Hydroelectric Power Station headrace tunnel downstream of adit No. 紅葉二級水電站引水隧洞2號支洞下游塌方段處理。
- With the progress of the mining operation in Lanjian Iron Ore year on year the effect of blasting vibration on safety of adit is increasing. 隨著蘭尖鐵礦采場水平逐年下降,爆破震動對平硐的安全影響日益突出。
- The development systems are the adit and pass above 4100m level, and underground shaft under 4100m. 4100m以上選用平硐溜井開拓系統,4100m以下選用盲豎井開拓系統。
- The undisturbed soil is usually sampled through excavating shaft and adit,but through borehole sampling for deep soil. 目前 ,在工程實踐中對原狀土樣的採取多通過開挖豎井及平洞的方法進行 ,但在埋深較大的情況下 ,由於開挖豎井及平洞較為困難 ,多採取鑽探取樣的方法。
- Mine exploit is divided into several phases. In the first phase, main adit is located at 4100m. 採用分期開採,前期主平硐設在4100m水平。
- We have an exciting activity in the first day, because the mine owner allow us to enter the adit. 想不到第一天便有驚喜節目,因為礦主特別准許我們下礦洞參觀。
- Adit Testdesk the use of the test design has been tested to show the level of knowledge or what can be done. 使用 Adit Testdesk 的測試設計可以顯示被測試者的知識水平或者可以做哪些事情。
- The results are helpful for designing and construction of intersection of main tunnel and adit in major highway tunnel. 研究結論對長大公路隧道設計、施工橫通道,有一定參考價值。
- The algorithms of clipping, intersection and translation are also given when the dault demarcation line crosses the path of a borehole or an adit. 對於地質剖面圖中斷層分界線遇到鑽孔或平洞的情況,文中建立了它們的求交、平移和裁剪演算法。
- The results indicate that the adit is stabile and the value of the given critical antivibration velocity of rock is a little low. 結果表明現爆破下平硐是穩定的,規範中給定的岩體極限抗震速度有些保守。
- The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed. 文中針對萬家寨引黃工程輸水隧洞及泵站平洞豎井存在的滲漏原因進行分析研究。
- PD29 exploration adit and the spring water nearby. Blowing spots of groundwater are controlled by T 2-3Z 2(4) rock layer and NW-striking fissures. 地下水涌水點的分佈受 T2 - 3z2 ( 4 )層和 NW向張性裂隙帶控制。
- CHEN Zhong.Introduction of intersection design of adit and highway tunnel[J].Journal of Science &Technology Communication,2000,(1):1-4. [2]陳中.;公路隧道行車橫洞與正洞交叉連接部的設計簡介[J]
- Abstract: Good results were achieved in PD103 adit of Yangshan mining area in South Gansu by smooth blasting and new Austrian method. 中文摘要: 光面爆破法和新奧法在隴南文縣陽山礦區PD103平硐施工中取得了非常好的效果。
- Adit Testdesk at training, psychological testing, skills testing, corporate training plan, market surveys and other similar areas of very effective. Adit Testdesk 在培訓,心理測試,技能測試,公司培訓計劃,市場調查以及其它類似的領域非常有效。