The substructure Contractor shall be responsible for the provision of various utility connections as shown on the Drawings and Specifications.

 
  • 地下建築承包商應負責提供圖紙與說明中所示的各部位的公用設施接頭
今日熱詞
目錄 附錄 查詞歷史