您要查找的是不是:
- 長螺旋施工CFG樁CFG pile by long auger machine
- 長螺旋施工long spiral construction
- 長螺旋鑽孔內泵壓CFG樁施工的質量控制The quality control of pressure pumped CFG piling construction by continuous auger drilling
- 混合料堵管是長螺旋鑽管內泵壓CFG樁成樁工藝中最為普遍的問題之一。Mix-material clog pipe is one of the common problem in CFG(Cement Fly-Ash Gravel) pile of long twist auger pump pressure in pipe.
- 長long
- 介紹了CFG樁的工作墊層、分區與編號、樁頂標高的確定、振動沉管樁機械施工CFG樁的施工工藝、檢驗方法及標準和施工中常見問題及預防措施。The working cushion,section division and numbering,determination of the pile top elevations,process of construction by means of vibrating pipe sinking machines,test method and acceptance standard,usual problems and countermeasures are presented in the paper.
- 長的full-bottomed
- 螺旋helix
- 長大grow up
- 長達extend as long as
- 長短length
- 淺談CFG樁複合地基承載力及施工檢測BEARING PRESSURE ON COMPOUND FOUNDATION OF CFG PILE AND CONSTRUCTION DETECTION
- 最長longest
- 長靴boot
- 長時間的long-playing
- 淺議CFG樁螺旋鑽孔管內泵壓混凝土成樁法PRELIMINARY DISCUSSION ON THE TWIST BORING CONCRETE PUMPING PILING INSIDE PIPE OF CFG PILE
- 長時間yonks
- 最長的first born
- CFG樁CFG pile
- 長出outshoot