- 運行確認OQoperational qualification
- 15 GHz 的VLBI觀測發現在兩個微瓣之間存在一個微弱的核,從而確認OQ 208 為緻密對稱源(CSO)。The 15 GHz VLBI observations discovered a weak core located between the two mini-lobes and confirmed that OQ 208 is a CSO(Compact Structure Object).
- 確認verify
- 運行確認OQ
- 第一次運行確認安裝測試可能需要幾分鐘。Running a verification installation test for the first time may take several minutes.
- 性能確認(PQ)應該在安裝確認和運行確認成功完成的基礎上進行。Performance qualification (PQ) should follow successful completion of Installation qualification and Operational qualification.
- 儘管PQ被描述為一個獨立的活動,但是在某些情況下它會與OQ結合起來。Although PQ is described as a separate activity, it may in some cases be appropriate to perform it in conjunction with OQ.