您要查找的是不是:
- Measure the inner and outer diameter of big pipe. 用于测量大口径长钢管的内外径测量。
- Skylab was like a big pipe, or tube, with two levels. 天空实验室的样子很像一个带有两个平面的大管子,
- Nowadays, pipe roof method is widely used in forepoling methods when tunnels are excavated in areas of week or difficult ground. 当前,在隧道开挖通过软弱破碎岩体等不良地质条件时,管棚支护法是应用非常普遍的一种超前支护方法。
- Based on this case, a creative method of jacking culvert box within pipe roof is presented, otherwise called RBJ construction method (Roof-Box Jacking Method). 结合工程实际,提出了创新的管幕结合箱涵顶进的施工工法-RBJ工法(Roof-Box Jacking Method)。
- Now I'm guessing that he bought her the big pipe organ, and she's really not happy about it. 我猜,他送她一台管风琴,但她并不开心。
- In the project of cross-under the highway with pipe roof and culvert box method,the interspace between culvert box and pipe roof is limited by several factors. 管棚-箱涵法下穿越高速公路工程中,管棚与箱涵的建筑空隙受到多方面因素影响, 合理的建筑空隙在保证不增加成本的条件下,为施工带来方便。
- It has certain difficulties to perform pipeline pressure testing and drying because of com-plicated and variable topography and landform,long distance,big pipe diameter and high pressure. 西气东输管道沿线地形地貌复杂多变,且距离长,管径大,压力高,其管道试压与干燥施工具有一定的难度。
- The condition applying big pipe pile of concrete to Shantou Port was introduced and the inquiy on the standard and the technical measures for stopping hamer of piling were made in the paper. 介绍混凝土大管桩在汕头港的应用情况,对沉桩停锤标准及技术措施进行了探讨。
- Abstract: The condition applying big pipe pile of concrete to Shantou Port was introduced and the inquiy on the standard and the technical measures for stopping hamer of piling were made in the paper. 摘 要: 介绍混凝土大管桩在汕头港的应用情况,对沉桩停锤标准及技术措施进行了探讨。
- Construction of long pipe roof for a highway tunnel 公路隧道长管棚施工技术
- advanced support with long pipe roof 长管棚超前支护
- pipe roof culvert box advancing method 管幕箱涵法
- Our firm is likely to reap a big profit this year. 今年我们公司很可能获得巨额利润。
- pipe roof high pressure grouting 管棚法高压注浆
- tunnel pipe roof supporting structure 管棚支护结构
- That little bop made away with the big pie. 小男孩把大馅饼吃光了。
- This paper serves as a general guide for the design and analysis of tunneling through soft clay with pipe roofing method. 分析评估土体变形及地表沉陷,符合设计条件要求,为工程设计及分析上之挑战。
- The big dog leapt up at the little girl. 那条大狗跳起来朝小女孩扑去。
- The paper presents the design criteria and method for arresting crack and burst of the internal pressured vessels of big pipes with circular surface crack by arched strip and wound wire. 本文介绍了含有表面环向裂纹的内压简体及大型管道采用轴向加弧形务板与钢丝缠绕的止裂、抑爆设计原则及设计方法。
- Edward is the big daddy of our golf club. 爱华德是我们高尔夫球俱乐部里的重要人手。