您要查找的是不是:
- berm spillway 护道排水沟
- At the top of the shore is a berm. 海岸顶上是后滨阶地。
- At the top of the shore is a berm . 海岸顶上是后滨阶地。
- The spillway face are RCC benched spillway face. 溢流坝面为碾压混凝土台阶式溢流面。
- Dongfeng hydropower station is open ski spillway. 东风水电站溢洪道为明流滑雪式溢洪道。
- The importance of a safe spillway cannot be overemphasized. 安全溢洪道的重要性无论怎样强调也不会过分。
- The spillway is opened and the flood runs down rapidly. 泄洪闸打开了,洪水奔流而下。
- There I sat, balanced in some sort of berm, in the pre-cell phone 80s. 因此我坐在,均衡,在某种护堤,在预手机80 。
- The interaction between the earth berm and the retaining structure is analyzed. 分析了反压土与支护结构相互作用的机制。
- Trees will not help much. Sound barrier or earth berm is the best way. 过客评论2007-10-1022:50:31发表于焦点房地产网-谈房论市-雍景天成论坛
- The typical seepage flow field of the bottom for the spillway dam is obtai... 最后计算了典型的坝基渗流流场,计算结果与实验结果吻合较好。
- The spillway can't be blocked, otherwise it will cause a serious problem. 不能堵塞洩洪道,否则后果不堪设想。
- The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on. 报告给出了复杂断面上波浪爬高和越浪量的计算公式,计算中考虑了前滩、边坡糙率、边坡坡度、平台、波浪入射角以及竖墙等因素的影响。
- High temperature on permafrost berm could deteriorate the degeneration of the frozen soil under the embankment. 高温冻土区护道会加剧路基下冻土退化;
- Keep the roots as dry as possible during winter, raising a berm to exclude melting snows during thaws. 保持基层干燥;尽量在冬季;提高了护堤;以排除冰雪融化;在融化.
- The outflow through gate controlled multi-opening spillway of Yinhe Reservoir was analyzed.The analysis results were checked by the site observed data. 分析了音河水库多孔有闸门控制的溢洪道出流,并用出流的实测资料进行了检验。
- My right foot got caught between the box and the right berm, and it turned my foot outward. 我的右脚陷入的方块之间的权利和护堤,它把我的脚离港。
- A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway. 地震时形成的一个主要的垂直断层崖,离溢洪道不到1000英尺。
- The concrete placement for spillway and overflow weir at Dongba Hydropower Station employs light truss type formwork. 洞巴水电站溢洪道溢流堰的混凝土浇筑使用轻型桁架模板。
- The energy dissipation rate is 40 to 70% higher than that of the skimming spillway. 在试验范围内,台阶式溢洪道与光滑溢洪道比较,消能率可以提高40%25 ~70%25。