您要查找的是不是:
- beam guiding path method 波束引导路径法
- Hungarian algorithm with Steward path method is tedious. 已报道的结合“Steward通路”的匈牙利算法及一些其它的算法运算量很大,很难推广应用;
- On our most projects Critical Path Method( CPM) is used for scheduling. 在我们的大多数工程项目中都采用“统筹法”(关键路线方法,简称CPM)排计划。
- Dipole magnets used as beam guiding elements in particle accelerators andstorage rings require very tight tolerances on their magnetic fields. 在粒子加速器中,两极磁铁(即弯转磁铁)是束流导向部件,对其磁场的要求很高。
- M.M.Baligh(1985),strain path Method J.Geotech,Engineering Div,ASCE(1)GT,9. 姚笑青;胡中雄.;饱和软土中沉桩引起的孔隙水压力结算[J]
- The critical path method was originally developed to solve scheduling problems in an industrial setting. 关键路线方法最初的发展是为了解决一项工业安装的安排问题。
- Giving up search path method of a colony of ants and select search path method of an ant. 摒弃一群蚂蚁的探路模式,采用一只蚂蚁的探路模式;
- The following are assumptions that he made when doing the initial schedule using the critical path method (CPM). 以下列出了项目经理使用关键路径方法(CPM)制定最初进度计划时所作的一些假设条件。
- The critical path method (CPM) uses single-time estimation and does not consider time variability. 要径法(CPM)工期是采单时估算的方式,并无不确定性工期之考虑。
- Ultrasonic flaw location in semisphere butt welds by sound path method is described. 介绍半球对接焊缝超声探伤的声程定位方法。
- Nevertheless, the simplicity of activity duration estimating in the CPM(Critical Path Method) can hardly engender actual value. 但CPM(Critical Path Method)进行工序历时估计的单一性使之不容易得到反映实际情况的值;
- The control functions for flying shears, auxiliary guide path, multichannel device, etc. are described espeially. 着重介绍了飞剪、辅助导槽和分路器等的控制功能。
- High Power Laser Welding System with Beam Guiding by Fiber 大功率光纤传输连续激光焊接系统
- His interests have also encompassed physical mapping, as exemplified by the Lander-Waterman formulas, and genome sequence assembly using an Eulerian path method. 他的兴趣也围绕物质绘图,作为经证明以这著陆器沃特曼公式和基因顺序会议使用欧拉路径方法。
- Change walking beam guide structure from slide bush type to glide orbit type, make walking beam move more dexterously and nimble, and with good movement rigidity. 行走梁移动导向结构由以往的滑套式改为滑动导轨式,便得行走梁运行更轻巧、灵活,运动刚性好。
- Today, most of the international PM software use critical path method (CPM).Nevertheless, with the development of PM, those applications have not fit in with actual demand. 当今国际主流项目管理软件多采纳关键路径法(CPM),伴随项目管理的深入和发展,这类软件难以适应实际需要。
- Through the use of critical path method and the process of mapping network model, analyse the progress of activities, optimize the process model for the goal of the cost and time. 通过运用关键路径法和绘制网络图对过程模型中活动进度安排进行分析,并且以时间-成本为目标对过程模型进行优化。
- They cleaved a path through the wilderness. 他们在荒原中开辟出一条路。
- She performed on the balance beam with much grace. 她在平衡木上表演得非常优美。
- She squelched along the muddy path. 她沿着泥泞小径格吱格吱地走。