您要查找的是不是:
- But I must point out that our factory has a lot of back order on hand. 但我必须指出,我们的厂家手头上的过期订单很多。
- back order cost 延迟交货成本
- They are on back order for months. 他们收到回来的决定几个月了。
- We may have to back order three items on this order. 这次订的货有三个项目必须要晚点才能交货。
- A: We may have to back order three items on this order. 这次订的货有三个项目必须要晚点才能交货。
- With so many back order on hand,we can not promise any shipment before October. 由于手头上的过期订单那么多,所以我们无法答应十月之前装运。
- Liaise with parts department on the parts availability for items back order. 与零件部联系,视延缓发货货物的可提供性。
- There are two basic types of cost accounting systems: job order cost accounting and process cost accounting. 有两种基本的成本会计方法:分披成本会计与分步成本会计。
- After the strike it took the factory six weeks to clear all the accumulated back order. 罢工之后,该场用了六周的时间把全部积压的定货发出。
- Traditional deterministic economic Lot-Size models assume that the demand rate is a constant, that the order cost is inflexible during every order cycle. 传统的确定性经济批量模型通常都假定需求率是常数,且每周期的相关费用是固定不变的。
- After the strike it take the factory six week to clear all the accumulated back order. 罢工之后,该场用了六周的时间把全部积压的定货发出。
- If they are in back order status, we will send the estimated waiting time to customer by email. 若货品处于缺货的状态,我们会以电邮知会顾客订货所需时间。
- In the cost flow of a job order costing system, the account of Goods in Process is the heart. 在分批法中,在产品账户为其核心。
- On receipt of the goods, they are immediately linked to the back order and issue can take place. 在收到货物后,它们会立即被连到欠交定单并允许出库。
- The specific cost flow of a job order costing system shows in Figure 14-2 as fol1owing. 分批法的成本流程列示如图14-2。
- With so many back order on hand, we can not promise any shipment before October. 由于手头上的过期订单那么多,所以我们无法答应十月之前装运。
- In a job order costing system, job cost sheets will serve as the subsidiary records for the work in process account. 采用分批成本会计法,分批成本单将作为在制品帐户的辅助记录。
- To our regret,we cannot increase our supply for the moment as our manufacturer have so many back order to catch up with. 很遗憾,我们现在不能增加供应,因为厂方有许多过期定单要赶着完成。
- Most of the EOQ models cover ordering cost, holding cost and shortage cost, with an invariable demand and price is steady. 大多数EOQ模型所考虑的费用包括订货费用、库存维持费用和缺货费用,且库存的需求量是恒定的,单价与订货数量无关。
- To our regret, we cannot increase our supply for the moment as our manufacturer have so many back order to catch up with. 很遗憾,我们现在不能增加供应,因为厂方有许多过期定单要赶着完成。