您要查找的是不是:
- arch dam geological condition 拱坝地质
- The principles of arch dam foundation treatment design are expounded in combination with engi-neering geology condition at dam site of Ertan Hydroelectric Plant. 结合二滩水电站坝址区工程地质条件,阐明拱坝基础处理设计的原则,全面介绍了基础处理设计中采用的主要工程措施和先进技术。
- THE STUDY ON ROCK MASS'S FNGINEERING GEOLOGIC CONDITION AND BUILDING SITE'S CHOOSING FOR THE DAM FOUNDATION OF THE HIGH ARCH DAM'S RIVER BED IN XILUODU 溪洛渡高拱坝河床坝基岩体工程地质条件与建基面选择研究
- Fault tree analysis is used to analyse the high arch dam risk. 摘要利用故障树分析法对高拱坝进行风险分析。
- Arch dam is one of foremost dam types in hydropower projects. 拱坝是水利水电工程中最重要的坝型之一。
- The stability of arch dam against elastic buckling has always been ignored. 摘要拱坝的抗屈曲稳定性一直是未被重视的问题。
- Overturning and sliding are seldom a factor in the design of arch dam. 拱坝设计中很少考虑倾覆和滑动的问题。
- Problems and Countermeasures of Earthquake Evaluation for High arch Dam. 高拱坝重大地震灾变评估的障碍和对策。
- Cracking Analysis of High Arch Dam Heel Based on Deformation Reinforcement. 基于变形加固理论的高拱坝坝踵开裂评价。
- A separate structure is provided to block the space between the arch dam and the reservoir bank. 需要另有一种单独的结构物来填补拱坝的库岸之间的空间。
- It plays the important guidance role in oilfield development,especially for the oilfield development of complex geological condition. 它对油田开发,特别是对地质状况复杂的油田开发,具有重要的指导作用。
- Construction technology and quality control of large diameter super-deep bored pile under complex geological condition are introduced. 介绍在复杂地质情况下超深大孔径桩基施工技术和质量控制措施。
- Actually and theoretically we attemp to discuss the relationship between the geological condition , mining factor or time factor and the coal burst. 试图从实际上和理论上论述地质条件、开采因素和时间因素与冲击地压发生的关系.
- The dam profile design and stress analysis are the major contents in arch dam design. 拱坝的体型设计和应力分析是拱坝设计的主要内容之一。
- The contrast analysis of thermal simulation to actual geological condition shows that this rule exists in geological history. 通过模拟条件与实际地质条件的对比分析认为,在地质条件下也存在上述规律。
- The dynamic performance test of dam concrete is a key problem to the construction of high arch dam at present. 大坝混凝土动态性能试验为当前高拱坝建设亟待解决的一个关键问题。
- This paper introduces the application of equi-block indexation method in geological condition evaluation of comprehensive mechanized coal mining. 介绍了等性块段指数法在矿井综采地质条件评价中的应用。
- Seepage proof facing plate or watertight concrete layer often locates in stone masonry arch dam. 在上游面或内部偏上游处设置了混凝土防渗层的砌石拱坝为成层异弹模坝。
- Due to the geological condition changes and abnormal earth magnetism behavior,some abnormal deviations happened with the MWD device. 在对接井施工过程中,由于出现了地磁变化异常和地质条件变化,致使MWD导向系统出现了一定偏差。
- It is cumbersome to analyze arch dam equivalent stress for the finite element results of arch dam. 摘要在拱坝有限元分析成果的基础上进行等效应力计算是件繁琐的工作。