您要查找的是不是:
- The dam profile design and stress analysis are the major contents in arch dam design. 拱坝的体型设计和应力分析是拱坝设计的主要内容之一。
- CONCRETE ARCH DAM DESIGN II. 混凝土拱坝设计2。
- Research on stress criteria of concrete arch dam design 混凝土拱坝设计应力控制标准的研究
- Rolled Concreted Arch Dam Design on Shaba Hydropower Station 沙坝水电站碾压混凝土拱坝设计
- Overturning and sliding are seldom a factor in the design of arch dam. 拱坝设计中很少考虑倾覆和滑动的问题。
- arch dam design 拱坝设计
- Fault tree analysis is used to analyse the high arch dam risk. 摘要利用故障树分析法对高拱坝进行风险分析。
- Arch dam is one of foremost dam types in hydropower projects. 拱坝是水利水电工程中最重要的坝型之一。
- The shape optimization design model for an arch dam under the action of static loads is dissolved by using the evolution strategy. 摘要采用进化策略求解静力荷载作用下拱坝体型优化设计的数学模型。
- With Puding Hydroelectric Project,the paper studies prototype observation design and embedding technique for observation instruments of RRC arch dam. 随着坝工技术的发展,碾压混凝土筑坝越来越受到坝工界的广泛重视,然而作为研究和发展这一新技术重要手段的原型观测,却未能跟上其发展的需要。 为此,国家在“七五”及“八五”期间均设立了专门的研究子题。
- The stability of arch dam against elastic buckling has always been ignored. 摘要拱坝的抗屈曲稳定性一直是未被重视的问题。
- To remove the unfavorable impact caused by the temperature rise of hydration heat during the construction period is key to the design of high RCC arch dam. 控制拱坝的裂缝是拱坝设计中必须认真解决的问题,而消除施工期水化热温升的不利影响,是碾压混凝土高拱坝设计中的关键。
- According to the design of spillway dam on arch dam in Wanjiagou reservoir,this paper elaborates special problems and solving method of spillway dam in design and construction. 本文以万家沟水库拱坝溢流坝的设计为例,阐述了这种坝型设计及施工的一些特殊问题及解决方法。
- Problems and Countermeasures of Earthquake Evaluation for High arch Dam. 高拱坝重大地震灾变评估的障碍和对策。
- Cracking Analysis of High Arch Dam Heel Based on Deformation Reinforcement. 基于变形加固理论的高拱坝坝踵开裂评价。
- The construction necessity for strong earthquake stations of Ertan arch dam is described in present paper.The design, installation and constitution are also introduced. 摘要论证二滩水电站拱坝反应台阵建设的必要性,介绍了台阵的设计安装和组成。
- The principles of arch dam foundation treatment design are expounded in combination with engi-neering geology condition at dam site of Ertan Hydroelectric Plant. 结合二滩水电站坝址区工程地质条件,阐明拱坝基础处理设计的原则,全面介绍了基础处理设计中采用的主要工程措施和先进技术。
- The hood on the process, as well as to increase the dress before the opening air dam design, the extension from a new generation of Skoda superb design. 而引擎盖上的突起、以及加大的前裙气坝开口设计,则延续了来自新一代斯柯达速派的设计。
- A separate structure is provided to block the space between the arch dam and the reservoir bank. 需要另有一种单独的结构物来填补拱坝的库岸之间的空间。
- Calculation results of an arch dam show that the stress-oriented shape optimization design method can rationally adjust the stress state of the dam so as to reach a higher safety factor. 以该模型计算某高拱坝的结果表明,以应力为目标的拱坝体型优化设计,可合理地调整坝体应力状态,从而获得更高的安全储备。