activity-based costing system

 
       
  • 作业成本系统

activity-based costing system的用法和样例:

例句

  1. Chapter three focuses on designing the form of Activity Based Cost System (ABCS), which is composed by the ABC, ABCM and performance value system.
    作业成本体系的框架设计是文章论述的第三个问题。 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。
  2. Chapter threefocuses on designing the form of Activity Based Cost System (ABCS), which iscomposed by the ABC, ABCM and performance value system.
    作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。
  3. The Application of Activity Based Costing System in Healthcare
    作业成本法在医疗卫生业中的应用研究
  4. Based on activity based costing, this paper puts forward a method for calculating railway traffic cost used in China Railroad Costing System(CRCS) and making use of cost information produced in CRCS.
    在中国铁路运输成本计算系统(CRCS)中,将铁路运输生产过程划分为发送、中转、运行和到达4个作业环节,并通过确定作业量以及对应的单位变动支出计算铁路运输成本。
  5. ACTIVITY BASED COSTING SYSTEM ORIENTED TO PLE SOFTWARE PROCESS
    面向产品线工程软件过程的作业成本系统

activity-based costing system的海词问答与网友补充:

提问补充

activity-based costing system的相关资料:

临近单词

目录
应用 附录 查词历史
    更多>>今日热词