active-base cost

 
       
  • 作业成本法

active-base cost的用法和样例:

例句

  1. Chapter three focuses on designing the form of Activity Based Cost System (ABCS), which is composed by the ABC, ABCM and performance value system.
    作业成本体系的框架设计是文章论述的第三个问题。 作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。
  2. Chapter threefocuses on designing the form of Activity Based Cost System (ABCS), which iscomposed by the ABC, ABCM and performance value system.
    作业成本体系框架由作业成本计算体系的设计,作业成本管理的设计以及业绩评价系统三部分组成。
  3. The thesis has analysed Activity Based Cost Management (ABCM) and Target Costing (TC) and made them compare with the traditional cost management.
    论文引用了作业成本管理法(ABCM)和企划成本管理法(TC),并与国内传统成本管理方法进行比较。
  4. Cost controluses the Activity Based Costing (ABC method) of traditional accounting forreference. It provides some suggestions about cost control in both partly andwholly as well.
    成本控制主要借鉴了会计中的 ABC 法予以确认,并从局部与整体两个方面提出了控制成本的建议。
  5. Activity Based Costing (ABC) is the media in the conbination of ABCM and the new ABMS.
    作业成本计算(ABC)是作业成本管理与作业管理新体系联结的中介。
  6. The basic idea of activity based costing is that products consume activities and activities consume resources.
    “产品消耗作业,作业消耗资源”是作业成本法的基本思路。

active-base cost的海词问答与网友补充:

提问补充

active-base cost的相关资料:

临近单词

目录
应用 附录 查词历史
    更多>>今日热词