Acquisition Material List

 
       
  • 采购器材表

Acquisition Material List的用法和样例:

例句

  1. The following code fragment deletes the material list.
    下面的代码片段释放材质列表
  2. Is there any mark for PPL or import part in detail drawing? Check quantity of material list, PPL and import part list.
    零件图上是否有关于PPL或进口零部件的标示?检查材料清单,PPL和进口零部件清单。
  3. Deliver the whole design package according to the project schedule, including proposal, layout plan, perspective, shop drawing and material list etc..
    依照项目时间表提供包含设计提案、平面布置图、效果图、施工图和装修材料清单等整套设计图纸;
  4. ATOR, COD( Contract Order Data), SEB( Standard Equipment), ODS( Electronic Order Data Sheet), STD Drawing and Material List, Cost Evaluation Model, PP3( Submit Passport3).
    熟悉产品开发整个过程:项目计划建立,销售规格书制定,标准产品设备手册,电子订货单,标准产品图纸和物料表,成本模型的建立,项目发布提交。
  5. ATOR, COD( Contract Order Data), SEB( Standard Equipment), ODS( Electronic Order Data Sheet ), STD Drawing and Material List, Cost Evaluation Model, PP3( Submit Passport3).
    熟悉产品开发整个过程:项目计划建立,销售规格书制定,标准产品设备手册,电子订货单,标准产品图纸和物料表,成本模型的建立,项目发布提交。

Acquisition Material List的海词问答与网友补充:

提问补充

Acquisition Material List的相关资料:

临近单词

目录
应用 附录 查词历史
    更多>>今日热词