abandoned dreg site

 
       
  • 弃渣场

abandoned dreg site的用法和样例:

例句

  1. Adopting fuzzy optimum seeking theory to select the scheme of abandoned dreg site is scientific and rational in hydroenergy storage station. ?
    采用模糊优选理论模型进行抽水蓄能电站弃渣场址方案的选择是科学的,合理的。
  2. The scheme of choosing abandoned dreg site of Taian hydroenergy storage station involved in a number of factors, such as uncertain factors, quantitative indexes, the sureness of the scheme is fuzzy.
    泰安抽水蓄能电站弃渣场址方案的确定涉及到众多因素的影响,既有确定性因素,又有不确定性因素; 既有定性指标,又有定量指标,方案的确定具有模糊性。
  3. Application of Fuzzy Optimum Seeking Theory to Choosing Abandoned Dreg Site in Taian Hydroenergy Storage Station
    模糊优选理论在泰安抽水蓄能电站弃渣场位置选择中的应用
  4. Choice of abandoned dreg site
    弃渣场选址