ZHANG Jian-min,XIAO Ru-cheng.Cable Force Optimization and Linetype Control for the Construction of a Thousandmeter Scale Cablestayed Bridge[J].China Civil Engineering Journal,2005,38(7):54-60.

 
  • [5]张建民;肖汝诚.;千米级斜拉桥施工过程中的索力优化与线形控制研究[J]
今日热词
目录 附录 查词历史