Works primarily as a result of floor Cagai reinforced body structure, the more unforeseeable factors, and management of the construction unit for the higher level of operations.

 
  • 因工程主要是对楼体结构进行拆改加固,现场不可预见因素多,对施工单位及其管理人员业务水平要求较高。
今日热词
目录 附录 查词历史