Within fifteen (15) days after signing the Contract the Contractor shall submit to the Engineer a schedule for the submittal of shop drawings and samples.

 
  • 承包商应在签署本合同后十五(15)天之内将一份施工图纸和样品提交项计划单提交至工程监理。
今日热词
目录 附录 查词历史