With the development of municipal engineering, large diameter belled piles are used more and more widely, but the study on vertical bearing mechanism of it is not enough for the practice.

 
  • 随着我国工程建设的发展,大直径扩底桩应用越来越广泛,然而对其竖向承载机理的研究却远不够。
今日热词
目录 附录 查词历史