With the commissioning of the Tin Shui Wai Phase III extension in March 1995, the system route length is now 32 kilometres with eight routes, 57 stops and a fleet of 119 cars,either operating singly or in pairs.

 
  • 随着天水围第III期支线工程在一九九五年三月完成后,轻铁系统现全长32公里,共有8条路线、57个车站,以及119节车卡,以单卡或双卡列车行走。
今日热词
目录 附录 查词历史