When the parallel shaft bricks are installed, the silicon carbide castable is placed behind, one course at a time and vibrated.

 
  • 安装完一层平行的井筒砖,碳化硅浇注料放在后面(提高耐高温效果),每次一层并且震一震(夯实,提高安装效果)
今日热词
目录 附录 查词历史