When the construction project is to be put into operation or use, their flood control works should pass the acceptance by the water conservancy administrative department. Houses built within flood storage and detention areas shall have flat roofs.

 
  • 建设项目投入生产或者使用时,其防洪工程设施应当经水行政主管部门验收。
今日热词
目录 附录 查词历史