When the commissioning of No. l Generating Unit at Dachaoshan hydropower station, both 500 kV facilities and the No. 2 Dakun transmission line were energized with no-load operation for about 2 days.
英
美
当大朝山电站1~%23发电机投入试运行时,大昆2~%23线及500 kv系统已空载稳定运行了近两天,调试CAT时,突然因接地故障保护装置动作,断路器分闸。
单词 When the commissioning of No. l Generating Unit at Dachaoshan hydropower station, both 500 kV facilities and the No. 2 Dakun transmission line were energized with no-load operation for about 2 days. 的词典定义。@海词词典-最好的学习型词典
以上内容独家创作,受
著作权
保护,侵权必究
今日热词
相关词典网站:
牛津高阶第八版
美国韦氏词典
Dictionary.com
Free Dictionary
维基百科 (自由的百科全书)
目录
附录
音标说明
查词历史
海词
权威词典
翻译
英 汉
|
汉语
|
上海话
广东话
缩略语
人名