When the claimant is preparing its analysis using this method it will only remove from the as-built those events for which it is entitled to an extension of time such as relevant events under JCT 98.

 
  • 进度计划软件会收录这些竣工活动的起止时间并形成反映实施计划的的横道图,此时的记录之间并不体现实施时的实际逻辑关系。
今日热词
目录 附录 查词历史