When one side of yoke beams and penetration bolts connected with the core, carry out Test after disconnecting the clips.

 
  • 当轭铁梁及穿芯螺栓一端与铁芯相连时,应将连接片断开后进行试验;
今日热词
目录 附录 查词历史