When all is done, the foundation part should be backfilled immediately so as to prevent desiccation crack of concrete, otherwise maintain measures should be taken.

 
  • 当上述工作结束后,基础部分应立即组织回填,以防止砼干缩裂缝的产生,否则应采取养护措施。
今日热词
目录 附录 查词历史