We test the RMA and round robin with multiple feedback in the simulation system. When the system load over 0.69, there are deadline dropping in the RMA scheduling.

 
  • 实验表明,系统负载大于0.;69时,RMA调度中开始有死线丢失。
今日热词
目录 附录 查词历史