WBS is always used to substantiate the bound of project, by which engendering the plan before optimizing it.A method of random simulation by computer is presented to optimize the plan.

 
  • 航空型号研制项目范围管理采用的主要方法是WBS工作分解结构,进而依据WBS形成计划,再进行计划的优化,本文提出了一种随机模拟法优化计划的方法。
今日热词
目录 附录 查词历史