您要查找的是不是:
- Vendor Lead Time 卖方的产品设计到实际投产间的时间
- Assuming that the buger confronts with the deterministic demand and the lead time is controllable, the vendor and the buyer's total expected cost model is constructed. 假设采购商面临正态需求,供应商的提前期可以控制,并基于此建立供应商与采购商联合期望总成本最小化模型。
- The research result shows that the application of VMI can effectively reduces total vendor level of SCM with the reduction of demand uncertainty and lead time. 研究结果显示,供应链中采用VMI之后,需求的不确定性降低和前置时间的缩短,能够有效地减少供应链总体库存水平,而且不同期间需求的关联性越强,采用VMI的效果越明显。
- After four weeks lead time qty of pcs. 四个礼拜货期可提供的产品数量
- Please advise your sample and product lead time. 请告知样品什么时间可以提供?及大货生产时间?
- After three weeks lead time qty of pcs. 三个礼拜货期可提供的产品数量
- What's the lead time for assembly? 组装的提前期是如何决定的?
- Continual improvement on the BOF% and lead time. 进口/产件准时交货率和交货周期的持续改进。
- What is the lead time for production of skiwear? 请阐述什麽是滑雪服生产的订货到交货前置时间。
- Shortening the lead time for testing. 缩短测试时间(提高测试效率)。
- What is the lead time for sample yardage? 生产样布的时间的是多久?
- Planning is an area where lead time can be reduced. 规划是一种缩短前导时间的方法。
- Most clients request shorter lead time and on-time delivery. 多数的客户都要求缩短交期与准时送货。
- Samples: Advise lead time as well as sampling charges if any. 请告知装箱时间和样品详情及其相关费用。
- Reducing order lead time can be taken by reducing batch. 可以通过订货小批量化缩短订货提前期。
- Implement Standard lead time, OEE, Lean production, SAP & 6S. 有效执行上司安排的工作,确保高质量、及时地完成。
- Please quote price, MPQ, MOQ and leading time. 该信息由诚信通会员发布,请登录后报价。
- Please quote the price, MOQ, MPQ and leading time. 该信息由诚信通会员发布,请登录后报价。
- Please quote the price, MPQ, MOQ and Leading time. 该信息由诚信通会员发布,请登录后报价。
- The vendor signs a contract with the purchaser. 卖方须与买方签订契约。