Using the present method, the reliable indexes of backfill in stope No. 3 in Anqing copper mine, Anhui province, were calculated, and the feasibility of filling design were evaluated.

 
  • 用本文方法对安庆铜矿3号高阶段采场充填体进行了可靠性分析,并评价了充填设计的可行性。
今日热词
目录 附录 查词历史