Unreasonable setting of pH value of the flotation operation stage resulted in low copper grade and recovery during its trial operation.

 
  • 建厂设计时,分离浮选作业的pH值设定不尽合理,致使试生产阶段铜精矿的品位低,回收率低。
今日热词
目录 附录 查词历史