您要查找的是不是:
- trigonometrical fuzzy number (TFN) 三角模糊数
- Trigonometric Fuzzy Number 三角模糊数
- trigonometry fuzzy number 三角模糊数
- The proprieties and priority problems of triangular fuzzy number complementary judgment matrix are studied. 摘要研究三角模糊数互补判断矩阵的性质和排序问题。
- Heilpern S.The expected value of a fuzzy number[J].Fuzzy Sets and Systems,1992(47):81 -86. 谭满益;唐小我.;模糊需求下的产品供给能力初步研究[J]
- Thirdly, it have put forward comprehensive evaluation model, which based on the triangular fuzzy number, AHP, Delphi and the benchmarking. 接着本文将基准分析思想、层次分析法、德尔菲法和模糊综合评价法相结合,提出了基于基准分析思想的三角模糊综合评价法。
- Dubois and H.Prade studied the properties of the system of fuzzy number, specially considered to establish the differential system of fuzzy number. Dubois和H.;Prade等人先后对模糊数系的各种性质进行了深入分析;特别是考虑到建立模糊数系的的微分等。
- We introduce the notion of dais point of fuzzy number net and use it to characterize the level convergence given by Kaleva and Seikkla. 借助于局部子基,给出了模糊数空间上水平收敛拓扑的构造。
- Aimed at the group decision-making problem based on language estimation information, the way of common group mind in trapezia fuzzy number system is mainly discussed. 针对基于语言评价信息的群决策问题,重点研究了梯形模糊数体系下的群体意见共识方法。
- The methods for safety culture evaluation of enterprise are presented on the basis of the triangular fuzzy number and AHP method,with the fuzzy analysis of qualitative factors. 利用三角模糊处理函数表示定性因素,提出了基于三角模糊数和层次分析法的企业安全文化评价方法。
- Related models of its and operation and compositor of triangular fuzzy number are introduced.The method of transformation and solution is as same as the previous model. 建立了它的模型以及三角模糊数的排序、运算,用类似于解决前一种模型的方法进行转化和求解。
- The algorithm can deal with the situation in which job processing time is triangle fuzzy number and trapezoid fuzzy number, so that the common ability is strengthened. 同时为了减少计算误差,该算法计算时不需要将模糊时间转换为精确时间求解,可以同时处理作业加工时间是三角模糊数或梯形模糊数的情况,从而更具有通用性。
- By the parametric representation, fuzzy number means a bounded continuous curve in the two-dimensional metric space R2, so that it is easy to analyze fuzzy differential equations. 在此参数表示下,模糊数可直接视为二维度量空间R2中的有界连续曲线,这给分析模糊微分方程带来了便利。
- Fuzzy constraints based triangular fuzzy numbers and the fuzzy cost based trapeze fuzzy numbers are discussed in this paper. 本文讨论了基于三角形模糊数的模糊约束条件和基于梯形模糊数的模糊费用。
- The new requirement of ally enterprise's workshop scheduling problem is analysed, and a heuristic fuzzy scheduling algorithm is presented by using the Fuzzy Number in the workshop scheduling problem for the first time. 分析了虚拟企业的成员企业对于车间作业调度的新的要求,首次在车间调度问题上应用“模糊数”的概念,提出一种启发式模糊作业调度算法,研究了模糊数的运算规则,给出了隶属函数图像为等腰三角形的有界闭模糊数的简便算法;
- The parameter of norm a k of normal fuzzy number has been given in which calculates and assesses different class of two step discrimination factor such as intensity, site kind, work situation and structural type. 文中给出了计算、评价构成二级评判因素地震烈度、场地类型、工作状态和结构种类各档次正态模糊数范数ak的参数和对实际情况如何确定的方法。
- Based on its thinking and trapezoidal fuzzy number expectations formula, the trapezoid fuzzy number definitions and related formula were given, decision-making compromise languge multiple indicator-type analysis was made. 基于折中型模糊多属性决策方法的思想和梯形模糊数期望的计算公式,提出了梯形模糊数的相关定义和公式,给出语言多指标决策问题的折中型分析法。
- The trapezoidal fuzzy number for denoting lingual random variable and the thought of TOPSIS are used in this model.And a scientific method for choosing cooperative partner in supply chain is provided. 此模型利用梯形模糊数来表示语言变量值,同时应用了TOPSIS的思想,为供应链合作伙伴的选择提供了一种较为科学的方法。
- In this article we construct extended fuzzy measure on fuzzy intervals, fuzzy numbers and cartesian product of fuzzy intervals and derive fuzzy measure space. 摘要本论文建构在模糊区间,模糊数和模糊区间的卡氏积上的扩张模糊测度并推导出模糊测度空间。
- Kuchta D.Use of Fuzzy Numbers in project Risk (criticality) Assessment[J].International Journal of Project Management,2001(5). 崔安定;赵远亮.;风险投资项目决策的模糊综合评价[J]