您要查找的是不是:
- Tracing Change Notice 跟踪变动通知
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- Review and follow-up process change notice, engineering deviation authorization and material review board recording after engineering reviewed. First article evaluation for new material. 在工程评审后,评审和跟进工序变更通知单,工程偏离认可单和物料评审单。新物料首样认证。
- The first part consisted of finding a site, the second of tracing changes on the site over time. 第一部分包括确立一个研究点,第二部分是查考研究点随时间的变化。
- The task of the second assignment was to trace changes on your site over time using old maps, plans, prints, and photographs. 第二份作业的任务是利用老地图、规划图、印刷品和照片来追踪研究基地随时间所产生的变化。
- The price is subject to change without notice. 价格随时更改,不另行通知。
- TECN Temporary Engineering Change Notice 工程规格暂行变更单
- The timetable is subject to change without notice. 本时刻表随时可能改变,不另行通知。
- QCN Quality Control Change Notice 品管规格变更单
- By use of Community Starter Kit,a website with functions of appraisal,user voting,uploading the quota,changing notice and subject is introduced in this paper. NET starter K it进行了描述,并用其中的Community starter K it构建了一个具有评价、用户投票、上载配额、更改通知和主题的W eb站点。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- Post Project Review Engineering Change Notice 工程变更通知书
- CSCN Customer Specification Change Notice 客户规格变更通知单
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及时处理工程变更通知,将精确的、有效的成本执行到生产工作中。
- An electrically produced graph or tracing. 电示图以电制作的图表或映描图
- Facility Chart Interim Change Notice 设施图临时修改通知
- Interim Technical Order Field Change Notice 临时技术指令野外更改通知
- I can't trace that letter you sent me. 我找不到你寄给我的那封信。
- He spoke without a trace of emotion. 他说话时毫不动感情。
- Part Card Procurement Change Notice 零件卡片采购修正通知