Tool utility tie-in points identified and base building tie-in point work completed for power, CDA, exhaust (characteristics verified per the utility matrix).

 
  • 公共设施已在点确定,基地建设已在点完成能源,综合发展区,排气(特色验证公用事业矩阵)建设。
今日热词
目录 附录 查词历史