To ensure the integrity of the girder and resist transverse bending due to dead load and service load, powerful transverse prestressing tendons were disposed in the diaphragms.

 
  • 为加强主梁受力的整体性,抵抗静载和动载产生的横向弯矩,横梁结构内设置了横向预应力钢束。
今日热词
目录 附录 查词历史