Through constructrual strength calculation and danger analysis of drain tank of Zhaijiachong tailingspool, buried consolidation method is adopted to carry on the project reformation, and expected effect has been obtained.

 
  • 通过对斋家冲尾矿库排水斜槽结构强度演算及危险分析,采用埋设加固方法进行工程改造,达到了预想效果。
今日热词
目录 附录 查词历史