Through comprehensive analysis and check computations of the pile of No. 4 pier of a certain highway, this essay presents a tentative improving measures to the pile of soft soil foundation abutment and bridge pier in designing and construction.

 
  • 通过某高速公路A桥4%23墩桩基的综合分析与验算;对软土地基桥台和近台桥墩的桩基设计与施工提出了初步改进措施.
今日热词
目录 附录 查词历史