This paper addresses a flow-shop scheduling problem with identical parallel machines at each stage (machine center) for minimizing the sum of the earliness and tardiness costs.

 
  • 摘要本论文强调一种在每一阶段(机器中心)具有平行机之流程式工作排程,求解最小化总提早及迟延成本之问题。
今日热词
目录 附录 查词历史