This article introduces the design and construction procedure of precipitation well at Wuhu xiazha No.2 drainage station and gives test results.

 
  • 摘要文章介绍芜湖下闸排涝2站深井降水的设计和施工工序,并给出试验结果。
今日热词
目录 附录 查词历史