There were three basic construction modes during the initial period of Alaska Pipeline design: conventional burial, special burial, and above ground berm or pile bent.

 
  • 阿拉斯加原油管道设计有传统埋设、特殊埋设和地上敷设。
今日热词
目录 附录 查词历史