Then the emphasis of Phase II was proposed.Based on the hydrodynamics and water quality models of the Suzhou Creek,Phase II of Suzhou Creek Rehabilitation Project was simulated and analyzed.

 
  • 为论证二期重点工程及其目标的合理性和可达性,应用苏州河水系水动力水质模型对二期工程措施的水质影响进行了数值模拟,模拟方案包括截污、底泥疏浚、综合调水等。
今日热词
目录 附录 查词历史