The unforeseen intense heat generated by the high quality concrete, grade bn.550 and bn.450, was overcome by cooling with inlaid cold water pipes.

 
  • 事先没有预料到标号为BN550和BN450的优质混凝土会产生很高的温度,后来采用内嵌冷水管冷却解决了这一问题。
今日热词
目录 附录 查词历史