The test results show that the tunnel with smaller values of C/D and of d/D will suffer the larger bending moment on the existing tunnel lining caused by jacking force.

 
  • 针对潜盾施工问题,本研究分为两大主题来讨论:第一部份探讨不同深径比下单隧道盾尾间隙闭合后,地盘应力释放所造成的隧道衬砌弯矩大小与分布情况;
今日热词
目录 附录 查词历史