The test for the wide span open stoping with subsequent fill in a high stress environment below the opencast pit was made in Deep Copper Mine operated by Baiyin Nonferrous Metals Co.

 
  • 白银深部铜矿在露天坑下部高应力环境下试验了大跨度空场嗣后充填采矿法。
今日热词
目录 附录 查词历史