The sum will cover expenses such as collecting and analyzing hydrological, geological and meteorological data as well as linking a production unit up to the electricity network and mechanizing it.

 
  • 这笔资金还将包括其它方面的支出:如收集并分析水文、地理、气象数据,连接电网以及机械动力的支出。
今日热词
目录 附录 查词历史