The soft start timing is determined by the filter capacitor at HPLL2 (pin 31), which is charged with an constant current during soft start.

 
  • 软性开始时间安排在 HPLL2(大头针 31),在软性开始期间与持续的涌流一起收费被过滤器电容器决定。
今日热词
目录 附录 查词历史