The results ofexample show that the reliability-based fuzzy optimum design is stable andreliable,which provided a new idea and method fbr the large complicatedstucture optimum design.

 
  • 算例结果显示了基于可靠度的结构模糊优化算法是合理的、经济的,为平台这一大型复杂结构的优化设计提供了新的思路和方法。
今日热词
目录 附录 查词历史