The project practice indicated, in this construction plan adopts prevented the raft board mass concrete temperature crack nine technical measure is effective.

 
  • 工程实践表明,此施工方案中所采取的防止筏板大体积混凝土温度裂缝的九项技术措施是行之有效的。
今日热词
目录 附录 查词历史