The project is going to be built by two phases.In the first phase, the section of railway from south Zunhua station to Sahe town will be repaired and built, whose whole length is 35 km.

 
  • 分为两期,一期工程为修复建设,完成遵化南站至洒河路段的修复和建设工程,全长35公里;
今日热词
目录 附录 查词历史