The other was the integrated project model based on the former DSM model which was used to calculate the duration of the project by the operation of partitioning.

 
  • 在子项目设计结构矩阵模型的基础上建立项目整体(包含多个子项目)的设计结构矩阵模型,并结合分区操作计算项目的总周期。
今日热词
目录 附录 查词历史