The original block caving system with floor pillar exists many effects,such as development work large,constraction difficult,production efficiency lower and ore loss great.

 
  • 原采用有底柱崩落法底板漏斗方案,存在采准工程量大、施工困难、生产效率低和矿石损失贫化大等问题。
今日热词
目录 附录 查词历史